top of page
Nalco 8457 -
– Fewer unplanned shutdowns due to tube leaks or fouling.
Direct injection into the (hot water going back to the tower) is preferred, immediately before the heat exchanger inlet. Never feed it into quiescent sumps or dead legs. nalco 8457
bottom of page
