Pwd | Dsr 2015-16 Maharashtra [better]
⚠️ Do not confuse with DSR 2013-14, 2017-18, or CPWD DSR (Central PWD).
Contractors, civil engineers, municipal officers, public procurement watchers, and informed citizens. Pwd Dsr 2015-16 Maharashtra
| Clause | Detail | |--------|--------| | | Up to 500 m free. Beyond that, add per 100 m. | | Lift | Up to 1.5 m free. Beyond that, add per 3.0 m. | | Water charges | 1% of estimated cost (or as specified). | | Royalty on minor minerals | To be paid extra (not included in DSR). | | GST / VAT | Not applicable – DSR 2015-16 includes excise/VAT as per pre-GST regime (use with caution today). | | Overheads | 15% for normal works, 20% for difficult terrain. | ⚠️ Do not confuse with DSR 2013-14, 2017-18,
Maharashtra Public Works Department (PWD) District Schedule of Rates (DSR) 2015-16 , a helpful feature is the Regional Premium System Beyond that, add per 100 m
: Higher rates are applied to compensate for transportation and labor challenges in inaccessible regions. Corporation Areas
The 2015-16 DSR is divided into several specific sections to cover the breadth of public infrastructure:
: Preparing detailed project reports and tender documents.
